Featured Projects
Here are some of the Featured Projects that DevTech Civils have completed in the last 5 years.
Construction of Bulk Earthworks for IDZ - Phase 1A - Stage 2
Value: R 139 000 000.00
Client: Richards Bay Industrial Development Zone
Duration: 24 Months
THE CONTRACT SCOPE INVOLVED CARRYING OUT ALL WORK REQUIRED FOR THE COMPLETION OF INTERNAL INFRASTRUCTURE AND ROADS AS FOLLOWS:
- ESTABLISHMENT FOR THE CONTRACTOR AND ENGINEER
- ACCOMMODATION OF TRAFFIC
- CLEARING OF THE ROAD RESERVE AND THE STRIPPING OF TOPSOIL TO STOCKPILE FOR LATER USE
- CONSTRUCTION OF DRAINAGE STRUCTURES AND THE INSTALLATION OF PIPE DRAINAGE
- BULK EARTHWORKS AND LAYERWORKS
- KERBING, CONCRETE V-DRAINS AND GRASS DRAINS
- SIDEWALKS
- ASPHALT PAVING
Re-Alignment of Inanda Arterial between Seacow Lake Road and Chris Hani Road
Value: R 60 900 000.00
Client: Ethekwini Municipality - GO! Durban
Duration: 18 Months
THE PROJECT COMPRISES OF THE RE-ALIGNMENT OF INANDA ARTERIAL BETWEEN SEACOW LAKE AND CHRIS HANI ROAD AND RELATED INFRASTRUCTURE FOR A PORTION OF A NEW ROAD THAT WILL BE UPGRADED INTO A DUAL CARRIAGE WAY, WHICH INCLUDES MAJOR BULK EARTHWORKS, ASSOCIATED STORM WATER DRAINAGE SYSTEM, WALKWAYS ALONGSIDE OF THE NEW ROAD SECTION, THE UPGRADE OF SEACOW LAKE ROAD WHICH INCLUDES THE TURNING HEAD AND THE RETAINING STRUCTURE.
THE CONSTRUCTION OF A ROAD-OVER-ROAD CONCRETE ROAD BRIDGE FOR THE KENVILLE ROAD LINK, AND A TAPER FROM DUAL CARRIAGEWAY TO A 2 LANE SINGLE CARRIAGE WAY TO MERGE WITH THE EXISTING ROAD AND ALSO RELOCATION EXISTING SERVICES.
Vusi Mzimela(Bellair) Road Upgrade - Phase 2 (Bulk Earthworks)
Value: R 35 600 000.00
Client: Ethekwini Municipality - Development Engineering
Duration: 15 Months
THE SCOPE OF THE PROJECT CAN BE SUMMARIZED AS FOLLOWS:
THE CLEARING AND GRUBBING OF ROADWAYS TO TIE IN THE BULK EARTHWORKS TO THE PROPOSED STRUCTURES
THE CONSTRUCTION OF A NEW BRIDGE STRUCTURE ADJACENT TO THE EXISTING BELLAIR ROAD BRIDGE
DIVERSION OF THE EXISTING RIVER TO CREATE A WORKING PLATFORM FOR PILING OF THE CENTRAL PIERS AND NORTH AND SOUTH ABUTMENTS
THE CONSTRUCTION OF GABIONS AS PROTECTION IN THE VICINITY OF THE ABUTMENTS
COMPLETION OF BULK EARTHWORKS FILL
TOPSOIL AND GRASSING OF EMBANKMENTS
THE CONSTRUCTION OF A NEW CULVERT WHICH TIES INTO THE EXISTING CULVERT ON VUSI MZIMELA ROAD
DIVERSION OF THE EXISTING RIVER TO CONSTRUCT THE BOX CULVERT, APRON SLAB, WING WALLS AND GABION MATTRESS
THE CONSTRUCTION OF GABIONS FOR EROSION PROTECTION ALONG THE BANKS OF THE RIVER
COMPLETION OF BULK EARTHWORKS FILL
TOPSOIL AND GRASSING OF EMBANKMENTS
THE INSTALLATION OF WATERMAINS
THE INSTALLATION OF CABLE DUCTS AND CABLE DUCT CROSSINGS
ROAD REINSTATEMENTS AND SIDEWALK REINSTATEMENTS
RELOCATION OF SERVICES
Upgrade of Main Road P489(KM 0.00 to KM6.00) in the Durban Region
Value: R 43 900 000.00
Client: Department of Transport - Kwa-Zulu Natal
Duration: 12 Months
THE CONTRACT SCOPE INVOLVED CARRYING OUT ALL WORK REQUIRED FOR THE UPGRADE OF THE ROAD, INCLUDING, BUT NOT LIMITED TO :
COMMUNITY LIAISON
ESTABLISHMENT FOR THE CONTRACTOR AND ENGINEER
ACCOMMODATION OF TRAFFIC
CLEARING OF THE ROAD RESERVE AND THE TRIPPING OF TOPSOIL TO STOCKPILE FOR LATER USE
CONSTRUCTION OF MINOR DRAINAGE STRUCTURES AND THE INSTALLATION OF PIPE DRAINAGE
BULK EARTHWORKS AND LAYERWORKS
KERBING, CONCRETE V-DRAINS AND GRASS DRAINS
DOUBLE SEAL SURFACING
INSTALLATION OF GUARDRAILS AND GABION WORKS
ROAD MARKING
FINISHING OF ROADWAY
DE-ESTABLISH, WORKING, AND CLOSING OF BORROW PITS
Dumisani Makhaye Village - Township Infrastructure Development
Value: R 30 000 000.00
Client: BPB Sindi Civils
Duration: 18 Months
THE CONTRACT SCOPE INVOLVED CARRYING OUT ALL WORK REQUIRED FOR THE COMPLETION OF INTERNAL INFRASTRUCTURE AND ROADS AS FOLLOWS:
- ESTABLISHMENT FOR THE CONTRACTOR AND THE ENGINEER
- ACCOMMODATION OF TRAFFIC
- CLEARING THE ROAD RESERVE AND THE STRIPPING OF TOPSOIL TO STOCKPILE FOR LATER USE
- CONSTRUCTION OF DRAINAGE STRUCTURES AND THE INSTALLATION OF PIPE DRAINAGE
- BULK EARTHWORKS AND LAYERWORKS
- KERBING, CONCRETE V-DRAINS AND GRASS DRAINS
- SIDEWALKS
- ASPHALT PAVING